BRC Gas Equipment of Cherasco (now part of the Westport Fuel Systems group)
which last October celebrated 24 years of partnership with the Kia Motors Italia group, has now available the DOEM business unit (Delayed- Original equipment manufacturer), a location where the actual installation of the gas implant is “moved” with respect to the manufacturer’s plant and takes place on dedicated lines of the same component’s manufacturer . Mr. Marco Torassa, DOEM sales manager declares: All the projects that are developed with this philosophy are subject of an in-depth development and standardization process, while emission tests, audits of the assembly line and the installation layout are carried out. All under the control of the manufacturer himself.
BLOG COMMENTS POWERED BY DISQUS